The Village of Whiting runs a private well permit, inspection, and abandonment program to meet the requirements of NR 810.16. It covers every well on a property connected to the village water system.
The DNR wants every well in the village either abandoned or properly permitted. Because of this, the Utilities Department will increase inspections and enforcement of the well abandonment ordinance, Sec. 15.52. For more information on well abandonment and permits, contact Jacob.
How to get a well operation permit
- Call to schedule a well inspection.
- If the well meets code, the village will give you a sample bottle for a coliform bacteria test.
- Collect a sample from the well's sample tap as described in the instructions that come with the bottle.
- Deliver or send the sample right away.
- The lab mails you the results.
- If the results say "safe" or "absent," bring them to the Village Hall to apply for the permit.
The permit is good for five years.
| Fee | Amount | Late fee |
|---|---|---|
| Private well operation permit, per 5-year permit | $25 | None |
Sample drop-off days
The Utilities Department sets 4 days when samples can be dropped off at the Village of Whiting Municipal Building, to be taken to the UWSP WEAL Lab for testing. Those dates are not scheduled yet. Call Jacob for details.
Well inspections
A well inspection is required before a private well permit is issued, and at least every 10 years after the first inspection. The village does well inspections at no charge to comply with ch. NR 810 subch. IV.
Newly built wells must also be tested for nitrates, along with coliform bacteria, for the first permit cycle. After that, only coliform bacteria testing is needed.