1) REQUIRED EROSION CONTROL. All subdividers shall cause all grading, excavations, open cuts, side slopes and other land surface disturbances to be so mulched, seeded, sodded or otherwise protected that erosion, siltation, sedimentation and washing are prevented in accordance with the plans and specifications approved by the Plan Commission. In addition:#
a. Sod shall be laid in strips at those intervals necessary to prevent erosion and at right angles to the direction of drainage.#
b. Temporary vegetation and mulching shall be used to protect critical areas, and permanent vegetation shall be installed as soon as practical.#
c. Construction at any given time shall be confined to the smallest practical area and for the shortest practical period of time.#
d. Sediment basins shall be installed and maintained at all drainage ways to trap, remove and prevent sediment and debris from being washed outside the area being developed.#
e. The subdivider shall be responsible at his expense for repairing any damage to all adjoining surface and drainage ways caused by runoff and/or sedimentation resulting from his activities.#
2) PROTECTING EXISTING FLORA. The subdivider shall make every effort to protect and retain all existing trees, shrubbery, vines and grasses not actually lying-in public roadways, drainage ways, building foundation sites, private driveway, soil absorption waste disposal areas, paths and trails. Such trees are to be protected and preserved during construction in accordance with sound conservation practices, including the preservation of trees by well islands or retaining walls whenever abutting grades are altered.#
3) ENTRY; COMPLIANCE.#
a. The subdivider agrees to permit the Building Inspector to enter onto the land regulated under this Chapter for the purpose of inspecting for compliance with this Chapter.#
b. The subdivider authorizes the Village to perform any work or operations necessary to bring the condition of the lands into conformity with the approved control plan, if required, and this Section, and further consents to the Village collecting the total of the costs and expenses of such work and operating as a special charge against the property for current services rendered as provided by law.#
A reading copy of the adopted code, from page 3 to 4 of the official chapter PDF. The PDF is the legal text.