1) PERMIT REQUIRED. No building of any part thereof shall hereafter be erected within the Village of Whiting or ground broken for the same, except as hereinafter provided, until a permit therefore shall first have been obtained from the Building Inspector by the owner, or his authorized agent. The term “building” as used in this Section shall include any building or structure, and any enlargement, alteration, heating or ventilating installation, sign, building moving, building razing, or anything affecting the fire hazards or safety of any building or structure.#
2) APPLICATION. Application for a building permit shall be made in writing upon a form furnished by the Building Inspector and shall state the name and address of the owner of the land and also the owner of the building if different, the legal description of the land upon which the building is to be located, the name and address of the designer, the use to which said building is to be put, and such other information as the Building Inspector may require.#
3) DEDICATED STREET REQUIRED. No building permit for any structure shall be issued unless the property on which the building is proposed to be built abuts a full street that has been dedicated for street purposes.#
4) UTILITIES REQUIRED.#
a. Residential Buildings. No building permit shall be issued for the construction of any residential building until sewer, water, grading and graveling are installed in the streets necessary to service the property for which the permit is required, and a receipt for payment of electrical hookup is presented to the Building Inspector.#
b. Non-Residential Building. No building permit shall be issued for the construction of any building other than residential until contracts have been let for the installation of sewer, water, grading and graveling in the streets necessary to service the property for which the permit is requested.#
5) PLANS. With such application there shall be submitted two (2) complete sets of plans and specifications, including a plot plan showing the location of the proposed building with respect to adjoining roads, highways, streets, alleys, lot lines and buildings. Plans for buildings involving the state Building Code shall bear the stamp of approval of the state department of Industry, Labor and human Relations. One plan shall be submitted which shall remain on file in the office of the Building Inspector. All plans and specifications shall be signed by the designer. Plans for all new one- and two- family dwellings shall comply with the provisions of Chap. Ind. 20-09(4), Wis. Adm. Code.#
6) WAIVER OF PLANS. If the building Inspector finds that the character of the work is sufficiently described in the application, he may waive the filing of plans for alterations, repairs of moving, provided the cost of such work does not exceed Two Thousand ($2,000.00) Dollars.#
7) APPROVAL OF PLANS.#
a. If the Building Inspector determines that the building will comply in every respect with all ordinances and orders of the Village and all applicable state laws and orders, he shall officially approve and stamp one set of plans and shall issue a building permit which shall state the use to which said building is to be put, which shall be kept and displayed at the site of the proposed building. After approval, the plans and specifications shall not be altered in any respect which involves the safety of the building or the occupants, except with the written consent of the Building Inspector.#
b. In case adequate plans are presented for part of the building only, the Building Inspector, at his discretion, may issue a permit for that part of the building before receiving the plans and specifications for the entire building.#
8) MINOR REPAIRS. The Building Inspector may authorize minor repairs or alterations valued at less than Five Hundred ($500.00) Dollars, which do not change the occupancy, area structural strength, fire protection, exits, light or ventilation of the building without issuing a building permit.#
9) INSPECTION OF WORK. The builder shall notify the Building Inspector when ready and the Building Inspector shall inspect all buildings upon the completion of the foundation forms, or before the foundation is laid, and again when ready for lath and plaster, dry walling or before paneling is applied. After completion, he shall make a final inspection of all new buildings, alterations, and existing buildings put to new uses.#
10) APPEALS. Any person feeling himself aggrieved by any order or ruling of the Building Inspector may within 20 days thereafter appeal from such order or ruling to the Board of Zoning Appeals, such an appeal to be in writing.#