1) DRAINAGE SYSTEM REQUIRED. A drainage system shall be designed and constructed by the subdivider to provide for the proper drainage of the surface water of the subdivision and the drainage area of which it is a part. A final plat shall not be approved until the subdivider shall submit plans, profiles and specifications as specified in this Section, which have been prepared by a registered professional engineer and approved by the Village Engineer.#
2) DRAINAGE SYSTEM PLANS.#
a. The subdivider shall submit to the Village Engineer and Plan Commission a report on the ability of existing watercourse channels, storm sewers, culverts, and other improvements pertaining to drainage or flood control within the subdivisions to handle the additional runoff which would be generated by the development of the land within the subdivision. Additional information shall be submitted to adequately indicate that provision has been made for disposal of surface water without any damage to the developed or undeveloped land downstream or below the proposed subdivision. The report shall also include:#
(1) Estimates of the quantity of storm water entering the subdivision naturally from areas outside the subdivision.#
(2) Quantities of flow at each inlet or culvert.#
(3) Location, sizes and grades of required culverts, storm drainage sewers and other required appurtenances.#
b. A grading plan for the streets, blocks and lots shall be submitted by the subdivider for the area with the subdivision.#
c. The design criteria for storm drainage systems shall be based upon information provided by the Village Engineer.#
d. Material and construction specification for all drainage projects (i.e., pipe. Culverts, seed, sod, etc.) shall be in compliance with specifications provided by the Village Board or Village Engineer.#
3) GRADING. The subdivider shall grade each subdivision in order to establish street, block and lot grades in proper relation to each other and to topography as follows:#
a. The subdivider shall grade the full width of the right-of-way of all proposed streets in accordance with the approved plans.#
b. Block grading shall be completed by one or more of the following methods.#
(1) A ridge may be constructed along the rear lot lines which provides for drainage onto the streets.#
(2) Parts of all lots may be graded to provide for drainage to the street or to a ditch along the rear lot line.#
(3) Drainage across ear or side lot lies may be permitted provided that drainage onto adjoining properties is skillfully controlled.#
c. Lot grading shall be completed so that water drains away from each proposed building at a minimum grade of two (2%) percent and provisions shall be made to prevent excessive drainage onto adjacent properties.#
d. The topsoil stripped by grading shall not be removed from the site and shall be uniformly spread over the lots when rough grading is finished.#
4) DRAINAGE SYSTEM REQUIREMENTS. The subdivider shall install all the storm drainage facilities indicated on the plans required in Subsection (a) of this Section.#
a. Street Drainage. All streets shall be provided with an adequate storm drainage system. The streets storm system shall serve as the primary drainage system and shall be designed to carry street, adjacent land and building storm water drainage. No storm water shall be permitted to be run into the sanitary sewer system with the proposed subdivision.#
b. Off-Street Drainage. The design of the off-street drainage system shall include the watershed affecting the subdivision and shall be extended to a watercourse or ditch adequate to receive the storm drainage. When the drainage system is outside of the street right-of-way, the subdivider shall make provisions for dedicating an easement to the Villages to provide for the future maintenance of said system. Easements shall be a minimum of twenty (20) feet, but the Village may require larger easements if more area is needed due to topography, size of watercourse, etc.#
5) PROTECTION OF DRAINAGE SYSTEM. The subdivider shall adequately protect all ditches to the satisfaction of the Village Board and Village Engineer. Ditches and open channels shall be seeded, sodded or paved depending upon grades and soil types. (Generally, ditches or channels with grades up to one (1%) percent shall be seeded; those with grades up to (4%) percent shall be sodded and those with grades over four (4%) percent shall be paved.)#
A reading copy of the adopted code, from page 12 to 13 of the official chapter PDF. The PDF is the legal text.