1. Except as provided below, no development shall be allowed in the floodplain which, acting in combination with existing or future similar works, will cause an increase equal to or greater than 0.1 foot (3 cm.) in the height of the regional flood or will adversely affect existing drainage courses or facilities.#
2. Obstructions or increases equal to or greater than 0.01 foot may only be permitted if amendments are made to this ordinance, the official floodplain zoning maps, including floodway lines and water surface profiles, in accordance with Article H, and only if the total cumulative effect of the proposed development will not increase the height of the regional flood more than 1.0 foot maximum increase hydraulic reach of the stream unless a waiver is secured from FEMA for the 1.0 foot maximum increase.#
3. For the purpose of this Chapter, increases on the regional flood elevation shall be calculated:#
a. Based upon an equal degree of hydraulic encroachment from the original hydraulic floodway lines for a hydraulic reach on both sides of the river or stream; and#
b. Based upon an equal degree of hydraulic encroachment throughout a hydrologic reach of a river or stream to determine the volume of storage area which is lost.#
4. Owners or operators of all existing mobile home parks and mobile home subdivisions located in the Regional Floodplain (in A-zones on flood hazard boundary maps or flood insurance study maps) shall file an evacuation plan, indicating alternate vehicular access and escape routes, including mobile home hauler routes, with the appropriate local disaster preparedness authorities, and shall provide for adequate surface drainage to minimize flood damage.#
5. All mobile homes to be placed on a site located in the Regional Floodplain (in A-zones on flood hazard boundary maps or flood insurance study maps) shall be anchored so they do not float, collapse or move laterally during a flood. Such mobile homes shall be anchored according to the following specifications:#
a. Over-the-top ties shall be provided at each of the four corners of the mobile home, with two (2) additional ties per side at intermediate locations and mobile homes less than fifty (50) feet long shall require one (1) additional tie per side.#
b. Frame ties shall be provided at each corner of the mobile home with five (5) additional ties per side at intermediate points and mobile homes less than fifty (50) feet long requiring four (4) additional ties per side.#
c. All components of the anchoring system shall be capable of carrying a force of four thousand, eight hundred (4,800) pounds; and#
d. Any additions to the mobile home shall be similarly anchored.#
6. The placement of all new mobile homes in addition to the standards listed above, must also meet the residential development standards in the flood fringe as found below.#
7. For all subdivision proposals, a “subdivision” is defined in Section 236.02(8), Wis. Stats., and other proposed developments exceeding five (5) acres in area or where the estimated cost of the proposed development exceed Seventy-Five Thousand ($75,000.00) Dollars, the applicant shall provide all computations which are required to show the effects of the proposal on flood heights, velocities and floodplain storage. Further, the applicant shall provide within such proposals regional flood elevation data, and the means to provide adequate surface drainage and to minimize flood damage. In those instances where the applicant is not required to provide computations and where inadequate data exists, the available information may be transmitted to be Department of Natural Resource’ District office for a determination of the flood protection elevation and for an evaluation of the effects of the proposal on flood heights, velocities and floodplain storage. Additional information, such as valley cross-sections or survey data may be required by the Department to determine the effects of the proposal. This information shall be obtained from the applicant or the applicant’s agent by the Village. The provisions of this Chapter shall apply hereto. The applicant shall provide all data and calculations for any development which would require an amendment to the district boundaries or regional flood profiles.#
8. Prior to any alteration or relocation of a watercourse, and prior to the issuance of any land use permit which may be required for the alteration or relocation of a watercourse, the Zoning Administrator shall notify adjacent municipalities, the appropriate district office of the Department of Natural Resources and the appropriate office of FEMA and shall require the applicant to secure all necessary state and federal permits. The flood carrying capacity within the altered or relocated portion of any watercourse shall be maintained.#
9. Development which requires a permit from the Department of Natural Resources, pursuant to Chapters 30 and 31, Wis. Stats., such as docks, piers, wharves, bridges, culverts, dams and navigational aids may be allowed provided the necessary Village permits are obtained and necessary amendments to the official floodway lines, water surface profiles, floodplain zoning maps or floodplain zoning ordinance, are made according to this Chapter.#
A reading copy of the adopted code, from page 4 to 5 of the official chapter PDF. The PDF is the legal text.