1. The Village Board hereby designates the Building Inspector as the official to receive, process, and, following approval by the Plan Commission, when required, issue zoning permits. A zoning permit is issued to show that the intended use of the property is in compliance with the requirements of the zoning district in which located.#
2. Cases when a zoning permit is required:#
a. Before any building or other structure which is the principal permitted use is erected, moved or structurally altered so as to change its use.#
b. Before any land use is substantially altered.#
c. Before any building or structure is erected or substantially altered which would be a Conditional Use or require a variance regardless of whether principal or occupancy.#
d. Before building an accessory structure, even though not intended for human occupancy.#
3. The permit application shall be made to the Building Inspector on forms provided by the Village. Applications shall be submitted in duplicate, except that when a site plan approval under this Municipal Code is required, they shall be submitted in quadruplicate. The application shall include the following information:#
a. Names and addresses of the applicant, owner of the site, architect, professional engineer or contractor.#
b. Description of the subject site by lot, block, and recorded subdivision or by metes and bounds; address of the subject site; type of structure; existing and proposed operation or use of the structure or site; number of employees; and the zoning district within which the subject site lies.#
c. Plat of survey, if deemed necessary by the Building Inspector, prepared by a registered land surveyor showing the location, boundaries, dimensions, elevations, uses and size of the following: subject site; existing and proposed structures; existing and proposed easements, streets and other public ways; off-street parking, loading areas and driveways; existing highway access restrictions; existing and proposed street, side and rear yards. In addition, the plat of survey shall show the location, elevation, and use of any abutting lands and their structures within forty (40) feet of the subject site.#
d. Proposed sewage disposal plan. If Village sewerage service is not available, this plan shall be reviewed by the Village Engineer who shall certify the writing that satisfactory, adequate and safe sewage disposal is possible on the sites proposed by the plan in accordance with applicable local, county and safe health regulations.#
e. Proposed water supply plans if Village water service is not available. This plan shall be reviewed by the Village Engineer who shall certify in writing that an adequate and safe supply of water will be provided.#
f. Additional information as may be required by the Village Board, Plan Commission, Village Engineer, and Zoning, Building, Plumbing or Heath Inspectors, including all information required for site plan approval under this Municipal Code.#
4. Fee receipt from the Building Inspector.#
5. The Building Inspector shall review the application and, if the application is complete and contains all required information, shall refer it to the Plan Commission if the recommendation is required.#
6. Upon referral of the application, the Plan Commission shall schedule a public meeting thereon as soon as practical, and the Plan Commission shall notice said meeting as deemed appropriate.#
7. Following necessary study and investigation, the Plan Commission shall render its decision and made a permanent part of the Commission’s minutes. Such decision shall include an accurate description of the zoning use permitted, of the property on which permitted, and any and all conditions made applicable thereto, or if disapproved, shall indicate the reasons for disapproval. The Plan Commission may impose any conditions or exemptions necessary to minimize any burden on any persons affected by granting the special use permit.#
8. A Zoning Permit shall be granted or denied in writing by the Plan Commission within thirty (30) days or within sixty (60) days of said date when site plan approval or a conditional use permit is required. The permit shall expire within six (6) months unless substantial work has commenced. Any permit issued in conflict with the provisions of this Chapter shall be null and void.#
9. When a Zoning Permit does not continue in conformity with the conditions of the original approval, or where a change in the character of the surrounding area or of the use itself cause it to be no longer compatible with surrounding areas, or for similar cause based upon consideration for the public welfare the special grant may be terminated by action of the Plan Commission following a public meeting thereon.#
a. Subsequent change or addition to the approved plans or use shall first be submitted for approval to the Plan Commission and if in the opinion of the Plan Commission such change or addition constitutes a substantial alteration, a public hearing before the Commission shall be require and notice thereof be given.#
10. Key Lock Box System Compliance#
a. Upon request of the Building Inspector, the Fire Chief shall provide certification to the Building Inspector that any such key lock box has been properly installed to the satisfaction of the Fire Department and this ordinance.#
b. No building permit or other type of permit or authorization issued by the Village of Whiting or any department or body there under constituted shall be issued or permissible unless and until any inspectable property required to be equipped with a key lock box is in compliance with this section.#
A reading copy of the adopted code, from page 7 to 8 of the official chapter PDF. The PDF is the legal text.